5. Fueling-neutralization stations. New developments and applications
Organization: Yangel Yuzhnoye State Design Office, Dnipro, Ukraine
Page: Kosm. teh. Raket. vooruž. 2023 (1); 48-55
DOI: https://doi.org/10.33136/stma2023.01.048
Language: Ukrainian
Annotation: The article dwells on development and study of the multifunctional operations while preparing propellant components for launch vehicle tank filling by high-boiling propellant components at the neutralization stations. The article considers the preparation of propellant for filling the launch vehicle stages with high-boiling propellant components of nitrogen tetroxide (oxidizer) and unsymmetrical dimethyl hydrazine (fuel) in terms of propellant saturation with helium and denitrogenation. Usually these issues refer to the common technology of propellant preparation and are tackled sequentially: first, propellant is drained into the filling tank of the filling system, then the propellant is denitrogened, for example purging the propellant by helium under atmospheric pressure in the tank, then propellant is saturated with helium to the given concentration by bubbling helium in the propellant, maintaining the set pressure of helium in the tank. This technology significantly complicates the process of propellant preparation, increases helium consumption, as well as the amount of the generated vapor, which requires recycling in the neutralization units.
This article studies multifunctional operations, where the propellant is simultaneously drained from delivery vehicles, saturated with helium and denitrogenated. Amount of residual nitrogen in the propellant and the main direction of deep denitrogenation of the propellant are calculated. Amount of generated vapor and consumed helium are determined. The process of propellant draining by extrusion, maintaining the given pressure in the tank and alternating the propellant drain on the closed vent device (compression) and open vent device (decompression) is studied.
As a result, the theoretical justification of multifunctional operations in preparation of high–boiling propellant components to fill the launch-vehicle stages is presented.
Key words: saturation with helium and denitrogenation of the propellant, drain with closed vent device, excessive pressure draining, gas-vapor mixture, neutralization system
Bibliography:1. Pozdeev G. L., Kucherenko R. A., Kucherenko T. V. Issledovanie osobennostey dostavki na kosmodrom komponentov raketnogo topliva s zadannym gazonasyschenniem. Kosmicheskaya technika. Raketnoe vooruzhenie: sb. nauch.-techn. st. / GP «KB «Yuzhnoye». Dnepr, 2019. Vyp. 1. S. 38–44. https://doi.org/10.33136/stma2019.01.038
2. Pozdeev G. L. Razrabotka I issledovanie metodov obespecheniya zadannyh parametrov pri zapravke: dis. na soiskanie kand. tehn. nauk. GP «KB «Yuzhnoye», 1978. Dnepropetrovsk. 123 s.
3. KRK «Tsiklon-4M». Zapravochno-neitralizatsionnaya stantsia. Tehnicheskiy proekt. С4М YZH-ANL 02802. GP «KB «Yuzhnoye». 2017. 108 s.
4. KRK «Tsiklon-4M». Predlozheniya po helirovaniyu komponentov topliva dlya zapravki 2-oy stupeni rakety-nositelya na ZNS s uchetom osobennostey dostavki topliva v hermetichnyh konteynerah-tsisternah. Nauchno-tehnicheskiy otchet. Tsiklon-4M. 21.18668.174 OT. GP «KB «Yuzhnoye», 2019. 33 s.
5. Sposob zakrytoy zapravki toplivnogo baka zhidkim toplivom i systema dlya ego osuschestvlenniya: pat. RU 2489327. В64F1/28.
Full text (PDF) || Content 2023 (1)
Downloads: 6
Dynamics of article downloads
Dynamics of abstract views
Downloads geography
Country | City | Downloads |
---|
USA | Dublin; San Mateo; Ashburn | 3 |
Unknown | | 1 |
Germany | Falkenstein | 1 |
Ukraine | Kremenchuk | 1 |