logo_ua
Desktop EN 2023
logo_ua
logo_ua

7. Prospective Gas Purification Device for LRE Test Bench

Organization:

Yangel Yuzhnoye State Design Office, Dnipro, Ukraine

Page: Kosm. teh. Raket. vooruž. 2018 (1); 39-45

DOI: https://doi.org/10.33136/stma2018.01.039

Language: Russian

Annotation: The paper considers the project of prospective integrated gas purification device for large-sized LRE test stand. The prognostic mathematical models are presented for evaluation of ecological indices of the integrated gas purification equipment.

Key words:

Bibliography:
1. Sokolov E. Y., Zinger N. M. Jet Devices. 3rd edition, revised. М., 1989. 352 p.
2. Abramovich G. N. Applied Gas Dynamics. In 2 parts. Part 1: Study guide for technical universities. 3rd edition, revised and enlarged. М., 1991. 600 p.
3. MODELING OF CHEMICAL AND PHASE EQUILIBRIUMS AT HIGH TEMPERATURES (ACTPA.4 рс). Version1:16. Description of Use. М., 1996. 51 p.
4. Gusev N. G., Belyayev V. A. Radioactive Emissions in Biosphere. М., 1991. 255 p.
5. Noise Control in Industry: Guide / Under the general editorship of E. Y. Yudin. М., 1985. 400 p.
6. Calculation and Measurement of Characteristics of Noise Created in Far Acoustic Field by Jet Aircraft / Under the editorship of L. I. Sorokin. М., 1968. 100 p.
7. GOST 31295.2-2005. Noise. Sound Attenuation at Propagation on Terrain. P. 2. General Calculation Method. 35 p.
Downloads: 14
Abstract views: 
252
Dynamics of article downloads
Dynamics of abstract views
Downloads geography
CountryCityDownloads
USA Boardman; Baltimore; Plano; Monroe; Ashburn; Ashburn; Portland; San Mateo; Boardman9
Singapore Singapore; Singapore; Singapore; Singapore4
Ukraine Dnipro1
7.1.2018 Prospective Gas Purification Device for LRE Test Bench
7.1.2018 Prospective Gas Purification Device for LRE Test Bench
7.1.2018 Prospective Gas Purification Device for LRE Test Bench
Visits:252